INDIAN RAILWAY STANDARD CONDITIONS OFCONTRACT:
Definitionsand Interpretation. 0101. In theContract, unless the context otherwise requires ; "Acceptanceof Tender" meansthe letter of memorandum communicating to the Contractor the acceptance of histender and includes an advance acceptance of his tender; "Consignee" means where the stores are required by the acceptance of tender to bedespatched by rail, road, air or steamer, the person specified in the Acceptanceof Tender to whom they are to be delivered at the destination; Where the Storesare required by the acceptance of tender to be delivered to a person as aninterim consignee for the purpose of despatch to another person, such otherpersons; and in any other case the person to whom the stores are required by theacceptance of tender to be delivered in the manner therein specified "Contract" means and includes the invitation to tender, instructions to tenderers, tender,acceptance of tender, Standard Conditions of Contract, Special Conditions ofContract, particulars and the other conditions specified in the acceptance oftender and includes a repeat order which has been accepted or acted upon by thecontractor and a formal agreement if executed; "Contractor" means the person, firm or company with whom the order for the supply is placedand shall be deemed to include the contractor's successors (approved by thePurchaser), representatives, heirs, executors and administrators as the case maybe, unless excluded by the terms of the contract "TheSub-contractor" means any person, firm orcompany from whom the Contractor may obtain any material or fittings to be usedin the supply or manufacture of the stores, "Drawing" means the drawing or drawings specified in or annexed to the Schedule orSpecifications . "Government" means the Central Governmentor a State Government, as the case may be; "TheInspecting Officer � means the person specifiedin the contract for the purpose of Inspection of stores or work under thecontract and includes his authorised representative; "Material" means anything used in themanufacture or fabrication of the stores "Particulars" include-(a) Specifications (b) Drawings (c) Pattern bearing the seal and signature of the Inspecting Officer (hereinaftercalled the sealed pattern) which shall include also a certified copy thereofsealed by the Purchaser for the guidance of the Inspecting Officer; (d) Sample sealed by the Purchaser for guidance of the Inspecting Officer(hereinafter called the certified sample) which shall include a certified copythereof sealed by the Purchaser for the guidance of the Inspecting Officer; (e) Trade pattern, that is to say, a pattern, stores conforming to which areobtainable in the open market and which denotes a standard of the IndianStandard Institute or other standardising authority or a general standard of theindustry; (f) "Proprietary mark "or "brand " means the mark or brand of a productwhich is owned by an industrial firm(g) any other details governing the construction, manufacture or supplyof stores as may be prescribed by the contract " Purchase Officer " means the officersigning the acceptance of tender and includes any officer who has authority toexecute the relevant contract on behalf of the Purchaser "The Purchaser " means the President of Indiain the case of stores ordered for the Indian Government Railways and includeshis successors and assignees "Signed" includesstamped, except in the case of an acceptance of tender or any amendment thereof "Site" means the place specified in thecontract at which any work is required to be executed by the contractor underthe contract or any other place approved by the Purchaser for the purpose; "Stores" means the goods specified in thecontract which the contractor has agreed to supply under the contract; "SupplyOrder" means an order for supply of stores andincludes an order for performance of service "Test" means such test as is prescribed by the particulars or considered necessary bythe Inspecting Officer whether performed or made by the Inspecting Officer orany agency acting under the direction of the Inspecting officer; "Unit" and "Quantity" means the unit and quantity specified in the contract; "Writing" or "Written" includes matter either in whole or in part, in manuscript, typewritten,lithographed, cyclostyled, photographed or printed under or over signature orseal, as the case may be;0121. The deliveryof the stores shall be deemed to take place on delivery of the stores inaccordance with the terms of the contract, after approval by the InspectingOfficer if so provided in the contract to - (a) theconsignee at his premises ; or (b) where so provided the interim consignee at his premises , or (c) acarrier or other person named in the contract for the purpose of transmission tothe consignee, or (d) The consignee at the destination station in case of contract stipulating fordelivery of stores at destination station. 0122. Words in thesingular include the plural and vice versa 0123. Wordsimporting the masculine gender shall be taken to include the feminine gender andwords importing persons shall include any company or association or body ofindividuals, whether incorporated or not; 0124. The heading of theseconditions shall not affect the interpretation or construction thereof; 0125. Terms and expressionnot herein defined shall have the meanings assigned to them in the Indian Saleof Goods Act, 1930 (as amended), or the Indian Contract Act, 1872 (as amended)or the General Clauses Act, 1897 (as amended), as the case may be. Parties- The parties to the contract are the Contractor and the Purchaser, as defined inClauses 0105 and 0113.0201. Authority ofperson signing the Contract on behalf of the Contractor-A person signing thetender or any other document in respect of the Contract on behalf of theContractor without disclosing his authority to do so shall be deemed to warrantthat he has authority to bind the Contractor. If it is discovered at anytime that the person so signing has no authority to do so, the Purchaser may,without prejudice to any other right or remedy of the Purchaser, cancel thecontract and make or authorize the making of a purchase of the stores at therisk and cost of such person and hold such person liable to the Purchaser forall costs and damages arising from the cancellation of the contract includingany loss which the Purchaser may sustain on account of such purchase. Theprovisions of Clause 0700 shall apply to every such purchase as far asapplicable.
0202.
Address of theContractor and notices and communications on behalf of the Purchaser:-
(b) Any communication or notice on behalf ofthe Purchaser in relation to the contract maybeissuedtotheContractorbythePurchase Officer and all such communications and notices may be served on theContractor either by registered posts or under certificate of posting or byordinary post or by hand delivery at the option of such officer. Quotations of rates by Contractors(a) The price quoted by the Contractor shallnot be higher than the controlled price fixed by law for the stores or wherethere is no controlled price, it shall not exceed the prices or contravenes thenorms for fixation of prices laid down by Government or where no such prices ornorms have been fixed by the Government, it shall not exceed the price appearingin any agreement relating to price regulation by any industry in consultationwith the Government. In any case, save for special reasons stated in thetender, the price quoted shall not be higher than the lowest price charged bythe Contractor for stores of the same nature, class or description to a privatepurchaser, domestic or foreign as well as Purchaser Governments. (b) If the price quoted is higher than thecontrolled price or where there is no controlled price, the price usuallycharged by the Contractor from a private Purchaser, domestic or foreign, as wellas Purchaser Government for the stores of the same nature, class or descriptionthe Contractor will specifically mention this fact in his tender giving reasonsfor quoting higher price(s). If he fails to do so or makes any mis-statement, itshall be lawful for the Purchaser, (i) to revise the price at any stage so as tobring it in conformity with the Sub clause (a) above or (ii) to terminate thecontract and forfeit the Security Deposit. Contract.0401. This contractis for the supply of the stores of the description, specifications and drawings,and in the quantities set forth in the contract on the date or dates specifiedtherein. Unless otherwise specified, the stores shall be entirely brandnew and of the best quality and workmanship to the satisfaction of theInspecting Officer. The stores shall further be in all respects acceptableto the Inspecting Officer. 0402. Any variationor amendment of the contract shall not be binding on the Purchaser unless anduntil the same is duly endorsed on the contract incorporated in a formalinstrument or in exchange of letters and signed by the parties. Security Deposit.0501. Unlessotherwise agreed between the Purchaser and the Contractor, the Contractor shall,within 14 days after written notices of acceptance of the tender has been postedto the Contractor, deposit with the railway concerned (in cash or the equivalentin Government Securities or approved Banker's Guarantee Bond) a sum equal to 5per cent of the total value of the stores detailed in the contract for which thetender has been accepted, subject to a maximum of Rs. 1,00,000 as a security forthe due fulfilment of the contract. 0502. If theContractor, having been called upon by the Purchaser to furnish security, failsto make and to maintain a security deposit within the specified period, it shallbe lawful for the Purchaser - (a) to recover from the Contractor the amountof such security deposit by deducting the amount from the pending bills of theContractor under the contract or any other contract with the Purchaser or theGovernment or any person contracting through the Purchaser or otherwisehowsoever, or (b) to cancel the contract or any partthereof and to purchase or authorise the purchase of the stores at the risk andcost of the Contractor and in that event the provisions of Clause 0702 shallapply as far as applicable. 0503. No claim shalllie against the Purchaser in respect of interest on cash deposits or GovernmentSecurities or depreciation thereof. 0504. The Purchasershall be entitled and it shall be lawful on his part to forfeit the saidsecurity deposit in whole or in part in the event of any default, failure orneglect on the part of the Contractor in the fulfilment or performance in allrespect of the contract under reference or any other contract with the Purchaseror any part thereof to the satisfaction of the Purchaser and the Purchaser shallalso be entitled to deduct from the said deposits any loss or damage which thePurchaser may suffer or be put by reason of or due to any act or other default,recoverable by the Purchaser from the Contractor in respect of the contractunder reference or any other contract and in either of the events aforesaid tocall upon the Contractor to maintain the said security deposit at its originallimit by making further deposits, provided further that the Purchaser shall beentitled to recover any such claim from any sum then due or which at any timethereafter may become due to the Contractor under this or any other contractswith the Purchaser. Delivery.0601. The Contractorshall as may be required by the Purchaser either deliver free or f.o.r. orc.i.f. at the place/places detailed in the contract, the quantities of thestores detailed therein and the stores shall be delivered or despatched notlater than the date specified in the contract. The delivery, will not bedeemed to be complete until and unless the stores are inspected and accepted bythe Inspecting Officer as provided in the contract. 0602. The Purchasershall not be liable to render assistance to the Contractor in securing or toarrange for or provide transport to the Contractor unless it is so specificallystated in the contract, notwithstanding that transport of the stores, iscontrolled by or under the orders of the Government. 0603. Notwithstanding any inspection and approval by the Inspecting Officer on theContractor's premises, property in the stores shall not pass on to the Purchaseruntil the stores have been received, inspected and accepted by the consignee.
0604.
No storesshall be deliverable to the consignee's depots on Sundays and public holidays
0700. Timefor and Date of Delivery ; the Essence of the Contract- The time for and the date specified in the contract or as extended for the deliveryof the stores shall be deemed to be of the essence of the contract and deliverymust be completed not later than the date(s) so specified or extended. 0701. Progressing of Deliveries- The Contractor shall allow reasonablefacilities and free access to his works and records to the Inspecting Officer,Progress Officer or such other Officer as may be nominated by the Purchaser forthe purpose of ascertaining the progress of the deliveries under the contract. 0702. Failure and Termination:- If the Contractor fails to deliver the storesor any instalment thereof within the period fixed for such delivery in thecontract or as extended or at any time repudiates the contract before the expiryof such period the Purchaser may without prejudice to his other rights:- (a) Recover from the Contractor as agreedliquidated damages and not by way of penalty a sum equivalent to 2 per cent ofthe price of any stores (including elements of taxes, duties, freight, etc.)which the Contractor has failed to deliver within the period fixed for deliveryin the contract or as extended for each month or part of a month during whichthe delivery of such stores may be in arrears where delivery thereof is acceptedafter expiry of the aforesaid period, or (b) Cancel thecontract or a portion thereof and if so desired purchase or authorize thepurchase of the stores not so delivered or others of a similar description(where stores exactly complying with particulars are not in the opinion of thePurchaser, which shall be final, readily procurable) at the risk and cost of theContractor. It shall, however, be in the discretion of the purchaser tocollect or not, the security deposit from the firm/firms on whom the contract isplaced at the risk and expense of the defaulted firm. Where action is taken under Subclause (b) above, the Contractor shall be liable for any loss which thePurchaser may sustain on that account provided the purchase, or, if there is anagreement to purchase 1 such agreement is made, in case of failure to deliverthe stores within the period fixed for such delivery in the contract or asextended within six months from the date of such failure and in case ofrepudiation of the contract before the expiry of the aforesaid period ofdelivery, within six months from the date of cancellation of the contract. The Contractor shall not be entitled to any gain on such purchase and the mannerand method of such purchase shall be in the entire discretion of the Purchaser. It shall not be necessary for the Purchaser to serve a notice of such purchaseon the Contractor. Note -- In respect of the stores which are noteasily available in the market and where procurement difficulties areexperienced the period for making risk purchase shall be nine months instead ofsix months provided above. Consequenceof Rejection- If on the stores being rejected by the Inspecting Officeror Interim Consignee or Consignee at the destination, the Contractor fails tomake satisfactory supplies within the stipulated period of delivery, thePurchaser shall be at liberty to: - (i) Require the Contractor to replace therejected stores forthwith but in any event not later than a period of 21 daysfrom the date of rejection and the Contractor shall bear all cost of suchreplacement including freight, if any, on such replacing and replaced stores butwithout being entitled to any extra payment on that or any other account, or (ii) Purchase or authorize the purchase ofquantity of the stores rejected or others of a similar description (when storesexactly complying with particulars are not in the opinion of the Purchaser,which shall be final, readily available) without notice to the Contractor at hisrisk and cost and without affecting the Contractor's liability as regards thesupply of any further instalment due under the contract, or (iii) Cancel the contract and purchase orauthorize the purchase of the stores or others of a similar description (whenstores exactly complying with particulars are not, in the opinion of thePurchaser, which shall be final, readily available) at the risk and cost of theContractor. In the event of action being taken under Sub clause (ii) aboveor under this Sub-clause, the provision of Clause 0702 above will apply as faras applicable. (iv) Where under the contract the pricepayable is fixed f.o.r. despatching station, the Contractor shall, if the storesare rejected at destination by the consignee, be liable, in addition to hisother liabilities, including refund of price recoverable in respect of thestores so rejected, to reimburse to the Purchaser the freight and all otherexpenses incurred by the Purchaser in this regard. Extensionof Time for Delivery- If such failure as aforesaidshall have arisen from any cause which the Purchaser may admit as reasonableground for extension of time, the Purchaser shall allow such additional time ashe considers to be justified by the circumstance of the case, and shall forgothe whole or such part, as he may consider reasonable, of his claim for suchloss or damage as aforesaid. Any failure or delay on the part ofsub-contractor, though their employment may have been sanctioned under Condition1500 hereof, shall not be admitted as a reasonable ground for any extension oftime or for exempting the Contractor from liability for any such loss or damageas aforesaid. Examinationof Drawing, Specifications and Patterns - When tenders are called for in accordance with a drawing, specificationor sealed pattern the Contractor's tenders to supply in accordance with suchdrawing, specifications or sealed pattern shall, be deemed to be an admission onhis part that he has fully acquainted himself with the details thereof and, inno circumstances, will any claim on his part which may arise on account of hisinsufficient examination of the said drawing, specification or scaled pattern beconsidered. Mistakesin Drawing.The Contractor shall be responsible for and shall pay for any alterations forthe works due to any discrepancies, errors or omissions in the drawings or otherparticulars supplied by him whether such drawings or particulars have beenapproved by the Purchaser or not provided that such discrepancies, errors oromissions be not due to inaccurate information or particulars furnished to theContractor on behalf of the Purchaser. If any dimension figure upon adrawing or plan differ from those obtained by scaling the drawing or plan, thedimensions as figured upon the drawing or plan shall be taken as correct. Samples. Advance Sample- Where an advance sample is requiredto be approved under the terms of the contract, the Contractor shall submit thesample free of cost to the Inspecting Officer within the time specified in theacceptance of tender. If the Contractor is unable to do so, he must applyimmediately to the Office issuing the acceptance of tender for extension of timestating the reasons for the delay. If the Purchaser is satisfied that areasonable ground for an extension of time exists, he may allow such additionaltime as he considers to be justified (and his decision shall be final) with orwithout alteration in the delivery period stipulated in the acceptance of tenderand on such conditions as he deems fit. In the event of the failure of theContractor to deliver the advance sample by the date specified in the acceptanceof tender or any other date to which the time may be extended as aforesaid bythe Purchaser or of the rejection of the sample, the Purchaser shall be entitledto cancel the contract and, if so desired, purchase or authorize the purchase ofthe stores at the risk and cost of the Contractor, in which case the provisionsof Clause 0700 shall apply as far as applicable. 1102. Unlessotherwise provided in the contract, all samples required for test shall besupplied by the Contractor free of cost. Where sample, which is suppliedfree, is rejected after examination and test, the same or whatever remains ofthe sample, after examination and test will be returned to the Contractor at hisrequest and cost within three months of the date of such rejection at publictariff rate at Owner's risk. Marking - Samples submitted shall be clearly labelled with the Contractor's name andaddress and the acceptance of tender number.1104. If theContractor submits a sample whether with, before or after the tender, the sameshall not govern the standard of supply except when it has been specificallystated so in the acceptance of tender. 1105. Where underthe contract, the Contractor is required to submit an advance sample, anyexpenses incurred by the Contractor on or in connection with the production ofstores in bulk, before the sample has been approved unconditionally, shall beborne by the Contractor and he shall not claim any compensation in the event ofsuch sample being found unacceptable by the Inspecting Officer.
1106.
The rejectionof the sample by the Inspecting Authority or Inspecting Officer shall be finaland binding on the Contractor.
1108. If, under thecontract, supplies are governed by a sealed pattern the Contractor shall bebound to examine such pattern before preparing a sample or manufacturing thestores in bulk as the case may be. Loan of Sample- If a certified sample is lent to the Contractor, it will bear a label containinginter alia variations known to the Inspecting Officer between the said sampleand the stores desired. If the Contractor finds any further variationbetween the certified sample and the particulars of specifications mentioned inthe contract he shall at once refer the matter to the Inspecting Officer and theContractors shall also give intimation of such discrepancy to the PurchaseOfficer. The Contractor shall follow the instructions of the InspectingOfficer as to what sample of particulars should guide the production of storesand the decision of the Inspecting Officer in the matter shall be final andbinding on the Contractor.1110. The Contractorshall not detach the said label from the certified sample and if for any reasonsthe said label gets detached the Contractor shall at once return the certifiedsample to the Inspecting Officer for attaching a fresh label. Riskof Loss or Damage to Government or Purchaser's Property.1201. All theproperty of the Government or Purchaser loaned whether with or without depositon terms and conditions to be separately agreed upon in respect of eachparticular contract to the Contractor in connection with the contract shallremain the property of the Government or the Purchaser, as the case may be. The Contractor shall use such property for the purpose of the execution of thecontract and for no other purpose whatsoever. 1202. All suchproperty shall be deemed to be in good condition when received by the Contractorunless he shall have within twenty-four hours of the receipt thereof notifiedthe Purchase Officer to the contrarct. If the Contractor fails to notify anydefect in the condition or quality of such property he shall be deemed to havelost the right to do so at any subsequent stage. 1203. The Contractorshall return all such property and shall be responsible for the full valuethereof to be assessed by the Purchaser whose decision shall be final andbinding on the Contractor. The Contractor shall be liable for loss ordamage to such property from whatever cause happening while such property is inthe possession of or under the control of the Contractor, his servants workmenor agents. 1204. Where suchproperty is insured by the Contractor against loss or fire at the request of theGovernment or Purchaser such insurance shall be deemed to be effected by way ofadditional Precaution and shall not prejudice the liability of the Contractor asaforesaid. Inspection by Inspecting Officer.1301. (a) When inspection during manufacture or before delivery or despatch is required,notice in writing shall be sent by the Contractor to the Inspecting Officer whenthe stores or material to be supplied are ready for inspection and test, and nostores shall be delivered or despatched until the Inspecting Officer hascertified in writing that such stores have been inspected and approved by him. (b) In cases where the Inspecting Authorityspecified in the contract requires on behalf of the Purchaser that cduring themanufacturing process of the component/stores, etc. is also to be done, noticein writing shall be sent by the Contractor to the Inspecting Officer to visithis premises/works to test the raw materials and/or conduct necessary inspectionduring the manufacturing process of the component / stores, etc. as deemedessential. Markingof Stores- The Contractor shall, if so required, athis own expense, mark all the approved stores with a recognized Government orPurchaser's mark. The stores which cannot be so marked shall, if sorequired by the Inspecting Officer, be packed at his own expense in suitablepackages or cases, each of which shall be sealed and marked with such mark.The Inspecting Officer shall also have power to mark the rejected stores with arejection mark so that they may be easily identified, if resubmitted forinspection. Facilities for test and Examination - The Contractor shall, at his own expense afford to the Inspecting Officer allreasonable facilities as may be necessary for satisfying himself, that thestores are being and/or have been manufactured in accordance with theparticulars. The Inspecting Officer shall have full and free access at anytime during the execution of the contract to the Contractor's work for thepurpose aforesaid, and he may require the Contractor to make arrangements forinspection of the stores or any part thereof or any material at his premises orat any other place specified by the Inspecting Officer and if the Contractor hasbeen permitted to employ the services of a Sub-Contractor, he shall in hiscontract with the Sub-Contractor, reserve to the Inspecting Officer a similarright. Costof Test- The Contractor shall provide, without anyextra charge, all materials, tools, labour and assistance of every kind whichthe Inspecting Officer may demand of him for any test and examination, otherthan special or independent test, which he shall require to make on theContractor'sPremisesandtheContractor shall bear and pay all costs attendantthereon. If the Contractor fails to comply with the conditions aforesaid,the Inspecting Officer shall, in his sole judgement, be entitled to remove fortest and examination all or any of the stores manufactured by the Contractor toany premises other than his (Contractor's) and in all such cases the Contractorshall bear the cost of transport and/or carrying out such tests elsewhere. A certificate in writing of the Inspecting Officer, that the Contractor hasfailed to provide the facilities and the means, for test examination shall befinal. Delivery of Stores for Test- TheContractor shall also provide and deliver for test, free of charge, at suchplace other than his premises as the Inspecting Officer may specify, suchmaterial or stores as he may require. Liabilityfor Costs of Special or Independent Test - In the events of rejection of stores or any part thereof by theInspecting Officer in the consequence of the sample which is removed to thelaboratory or other places of test, being found on test not in conformity withthe Contract and in the event of the failure of the Contractor for any reason todeliver the stores passed on test within the stipulated period, the Contractorshall, on demand pay to the Purchaser all costs incurred in the inspectionand/or test. Cost of test shall be assessed at the rate charged by thelaboratory to private persons for similar work. Methodof Testing- The Inspecting Officer shall have theright to put all the stores or materials forming part of the same or any partthereof to such tests as he may think fit and proper. The Contractor shallnot be entitled to object on any ground whatsoever to the method of testingadopted by the Inspecting Officer. StoresExpended in Test- Unlessotherwise provided for in the contract if the test proves satisfactory and thestores or any instalment thereof is accepted, the quantity of the stores ormaterials expended in the test will be deemed to have been taken delivery of bythe Purchaser and be paid for as such. Powers of Inspecting Officer- The InspectingOfficer shall have the power(i) before any stores or part thereof aresubmitted for inspection to certify that they can not be in accordance with thecontract owing to the adoption of any unsatisfactory method of manufacture. (ii) to reject any stores submitted as not beingin accordance with the particulars. (iii) to reject the whole of the instalmenttendered for inspection, if after inspection of such portion thereof as "hemay in his discretion think fit, he is satisfied that the same isunsatisfactory. (iv) the Inspecting Officer's decision asregards the rejection shall be final and binding on the Contractor. Charges for Work Necessary for Completion of the Contract- The Contractor shall pay all charges for handling, stamping, painting,marking, protecting or preserving patent rights, drawings, templates, models andgauges and for all such measures as the Purchaser or the Inspecting Officer maydeem necessary for the proper completion of the contract, though specialprovision therefore may not be made in the specification of drawings. Responsibilityof the Contractor for Executing the Contract. Risk in the Stores- The Contractor shall perform the contract in all respects in accordance with theterms and conditions thereof. The stores and every constituent partthereof, whether in the possession or control of the Contractor, his agents orservants or a carrier, or in the joint possession of the Contractor, his agentsor servants and the Purchaser, his agents or servants, shall remain in everyrespect at the risk of the Contractor, until their actual delivery to theconsignee at the stipulated place or destination or, where go provided in theacceptance of tender, until their delivery to a person specified in the contractas interim consignee for the purpose of despatch to the consignee. TheContractor shall be responsible for all loss, destruction, damage ordeterioration of or to the stores from any cause whatsoever while the storesafter approval by the Inspecting Officer are awaiting despatch or delivery orare in the course of transit from the Contractor to the consignee or, as thecase may be, interim consignee. The Contractor shall alone be entitled andresponsible to make claims against a Railway Administration or other carrier inrespect of non-delivery, short delivery, misdelivery, loss, destruction, damageor deterioration of the goods entrusted to such carrier by the Contractor fortransmission to the consignee or the interim consignee as the case may be. ConsigneesRight of Rejection � Notwithstandingany approval which the Inspecting Officer may have given in respect of thestores or any materials or other particulars or the work or workmanship involvedin the performance of the contract (whether with or without any test carried outby the Contractor or the Inspecting Officer or under the direction of theInspecting Officer) and not with standing delivery of the stores where soprovided to the interim consignee, it shall be lawful for the consignee, onbehalf of the Purchaser, to reject the stores or any part, portion orconsignment thereof within a reasonable time after actual delivery thereof tohim at the place or destination specified in the contract if such stores orpart, portion or consignment thereof is not in all respects in conformity withthe terms and conditions of the contract whether on account of any loss,deterioration or damage before despatch or delivery or during transit orotherwise howsoever.Note- In respect of materials pre-inspectedat the firm's premises the consignee will issue rejection advice within 90 daysfrom the date of receipt. 1503. Provided thatwhere, under the terms of the contract the stores are required to be deliveredto an interim consignee for the purpose of despatch to the consignee, the storesshall be at the Purchaser's risk after their delivery to the interim consignee,but nevertheless it shall be lawful for the consignee on behalf of the Purchaserto reject the stores or any part, portion of consignment thereof upon theiractual delivery to him at the destination if they are not in all respects inconformity with the terms and conditions of contract except where they have beendamaged or have deteriorated in the course of transit or otherwise after theirdelivery to the interim consignee. 1504. The provisionscontained in Clause 2200 relating to the removal of stores rejected by theInspecting Officer shall mutatis mutandis apply to stores rejected by theconsignee as herein provided. Note- In respect of stores inspected duringmanufacture or before delivery or despatch at contractor's premises theconsignee will issue communication of rejection within 90 days from the date ofactual delivery thereof. Sublettingand Assignment- The Contractor shall not, save withthe previous consent in writing of the Purchaser, sublet, transfer or assign thecontract or any part thereof or interest therein or benefit or advantage thereofany manner whatsoever.In the event of the Contractor's subletting or assigning this contract or anypart thereof without such permission, the Purchaser shall be entitled to cancelthe contract and to purchase the stores elsewhere on the Contractor's accountand risk and the Contractor shall be liable for any loss or damage which thePurchaser may sustain in consequence or arising out of such purpose. Changesin a Firm-(a) Where the Contractor is a partnership firm,a new partner shall not be introduced in the firm except with the previousconsent in writing of the Purchaser, which may be granted only upon execution ofa written undertaking by the new partner to perform the contract and accept allliabilities incurred by the firm under the contract prior to the date of suchundertaking.
(b)
On the death or retirement of any partnerof the Contractor firm before complete performance of the contract, thePurchaser may, at his option, cancel the contract and in such case theContractor shall have no claim whatsoever to compensation against the Purchaser.
(d) Consequence of breach Should a partner inthe Contractor firm commit a breach of Sub clause 1505 above or the Contractorshould commit a breach of the conditions 1506(a) of this Sub clause, it shall belawful for the Purchaser to cancel the contract and purchase or authorize thepurchase of the stores at the risk and cost of the Contractor and in that eventthe provisions of Clauses 0600 and 0700 as far as applicable shall apply. (e) The decision of the Purchaser as to anymatter or thing concerning or arising out of this sub clause or on any questionwhether the Contractor or any partner of the Contractor firm has committed abreach of any of the conditions in this sub clause contained shall be final andbinding on the Contractor. Assistanceto the Contractor-(a) The Contractor shall be solely responsibleto procure any material or obtain any import or other licence or permit requiredfor the fulfilment of the contract and the grant by the Purchaser or any otherauthority of a quota certificate or permit required under any law fordistribution or acquisition of iron and steel or any other commodity or anyother form of assistance in the procurement of the material aforesaid or anyattempt to render assistance in the matter aforesaid, or shall not be construedas a representation on the part of the Purchaser that the material covered bysuch licence or permit or quota certificate is available or constitute anypromise, undertaking or assurance on the part of the Purchaser regarding theprocurement of the same or effect any variation in the rights and liabilities ofthe parties under the contract. But, if by reason of any such assistanceas aforesaid, the Contractor obtains any materials at less than their marketprice or the cost of production of the stores is lowered the price of the storespayable under the contract shall be reduced proportionately, and the extent ofsuch reduction shall be determined by the Purchaser whose decision shall befinal and binding on the Contractor. (b) Every effort made by the Purchaser tosupply, or give assistance in the procurement of materials, whether from theGovernment stock or by purchase under a permit or release order issued by or onbehalf of or under authority from Government or by any officer empowered in thatbehalf by law or under other arrangements made by the Purchaser shall be deemedto be subject to the condition that it will be performed with due regard to theother demands and only if it is found practicable to do so within the stipulatedtime and the decision of the Purchaser whether it was practicable to supply orgive assistance as aforesaid or not shall be final and binding on theContractor. Useof Raw Materials secured with Government Assistance .
1601.
(b) where the raw material is issued to theContractor from Government stock, or (c) where advance payments are made to theContractor to enable him to purchase the raw material, or (d) Where raw material is arranged by theGovernment, the Contractor- (i) shall hold such material as trustee forthe Government, (ii) Shall use such material economically andsolely for the purpose of the contract. (iii) shall not dispose of the same withoutthe previous permission in writing of the Purchaser, and (iv) shall render due account of suchmaterial and return to the Government at such place as the purchaser maydirect all surplus or unserviceable material that may be left after thecompletion of the contract or its termination for any reason whatsoever. On returning such material, the Contractor shall be entitled to such pricetherefor as the Purchaser may fix, having regard to the condition of suchmaterial. 1602. Where thecontract is terminated due to any default on the part of the Contractor, theContractor shall pay all transport charges incurred for returning any materialup to such destination as may be determined by the Purchaser and the decision ofthe Purchaser in that behalf shall be final and binding on the Contractor. 1603. If theContractor commits breach of any of the conditions in this clause specified, heshall, without prejudice to any other liability, penal or otherwise, be liableto account to the Government for all moneys, advantages or profits accruing fromor which, in the usual course, would have accrued to him by reason of suchbreach. 1604. Where the storesmanufactured or fabricated by the Contractor out of the material arranged orprocured by or on behalf of the Government are rejected, the Contractor shall,without prejudice to any other right or remedy of the Government, pay to theGovernment, on demand, the cost price or market value of all such materialswhichever is greater. Indemnity.
1701.
The Contractorshall at all times indemnify the Purchaser against all
1702. The Contractorshall not be liable for payment of any royalty, licence fee or other expenses inrespect of or for making use of patents or designs with respect to which he isaccording to the terms of the contract, to be treated as an agent of theGovernment for the purpose of making use of patent or trade mark for fulfilmentof the contract. Packing.1801. The Contractorshall pack at his own cost the stores sufficiently and properly for transit byrail/road, air and/or sea as provided in the contract so as to ensure theirbeing free from loss or damage on arrival at their destination. 1802. Unlessotherwise, provided in the contract all containers (including packing cases,boxes, tins, drums and wrappings) in which the stores are supplied by thecontractor, shall be considered as non-returnable and their cost as having beenincluded in the contract price. 1803. If the contract provides that the containers shall be returnable, they must be marked �Returnable � and they will be returned to the Contractor as per termsof the contract. 1804. If thecontract provides that returnable containers shall be separately charged, theyshall be invoiced by the Contractor at the price specified in acceptance oftender. In such cases, the Contractor shall give full credit for theinvoiced amount if the containers are returned to the Contractor. Returnof containers shall be made within a reasonable time and in the event of anydispute or difference arising as to whether the containers were so returned, thedecision of the Purchaser thereon shall be final and binding and the Purchasermay, in his discretion award, such compensations as may in his opinion be properfor any undue delay in returning the containers. 1805. Each bale orpackage delivered under the contract shall be marked by the Contract or at hisown expense. Such marking shall be distinct (all previous irrelevantmarking being carefully obliterated) and shall clearly indicate the descriptionand quantity of the stores, the name and address of the Consignee, the grossweight of the package and the name of the Contractor with a distinctive numberor mark sufficient for the purpose of identification. All markings shallbe carried out with such material as may be found satisfactory by the InspectingOfficer as regards quickness of drying, fastness and indelibility. 1806. The InspectingOfficer may reject the stores if the stores are not packed/or marked asaforesaid and in case where the packing materials are separately prescribed, ifsuch materials are not in accordance with the terms of the contract. Suchrejection of the stores by the Inspecting Officer shall be final and binding onthe Contractor. 1807. Each bale orpackage shall contain a packing note specifying thename and address of the Contractor, the number and date of the acceptance oftender or supply order and the designation of the Purchase Officer issuing thesupply order, the description of the stores and the quantity contained in suchbale or package. Notificationof Delivery.Notification of delivery or despatch in regard to each and every instalmentshall be made to the consignee and to the indentor immediately on despatch ordelivery. The Contractor shall further supply to the consignee, or theinterim consignee, as the case may be, a packing account Quoting number of theacceptance of tender and/or supply or repeat and date of despatch of the stores. All packages, containers, bundles and loose materials part of each and everyinstalment shall be fully described in the packing account and full details ofthe contents of the packages and quantity of materials shall be given to enablethe consignee to check the stores on arrival at destination. The RailwayReceipt/Consignment Note or Bill of Lading, if any, shall be forwarded to theconsignee by registered post immediately on the despatch of stores. TheContractor shall bear and reimburse to the Purchaser demurrage charges, if any,paid by reason of delay on the part of the Contractor in forwarding the RailwayReceipt, Consignment Note or Bill of Lading. ProgressReports. 2001. The Contractorshall from time-to-time, render such reports concerning the progress of thecontract and/or supply of the stores in such form as may be required by thePurchaser. 2002. Thesubmission, receipt and acceptance of such reports shall not prejudice therights of the Purchaser under the contract, nor shall operate as an estoppelagainst Purchaser merely by reason of the fact that he has not taken noticeof/or subjected to test any information contained in such report. Freight.The stores shall bedespatched at public tariff rates. In the case of f.o.r., station ofdespatch contract, the stores shall be booked by the most economical route ormost economical tariff available at the time of despatch as the case may be. Failure to do so will render the Contractor liable for any avoidable expenditurecaused to the Purchaser. Where alternative routes exist, the Purchasershall, if called upon to do so, indicate the most economical route available, orname the authority whose advice in the matter shall be taken and acted upon. If any advice of any such authority is sought, his decision or advice in thematter shall be final and binding on the Contractor, 2101. In respect ofroad deliveries where the Municipal/local authorities do not accept Octroi Dutyexemption Certificate, the Octroi Duty shall be borne by the Seller. Removal of Rejected Stores.2201. On rejectionof all stores submitted for inspection at a place other than the premises of theContractor, such stores shall be removed by the Contractor at his own costsubject as hereinafter stipulated, within 21 days of the date of intimation ofsuch rejection. If the concerned communication is addressed and posted tothe Contractor at the address mentioned in the contract, it will be deemed tohave been served on him at the time when such communication would be in thecourse of ordinary post reach the Contractor. Provided that the InspectingOfficer may call upon the Contractor to remove dangerous, infected or perishablestores within 48 hours of the receipt of such communication and the decision ofthe Inspecting Officer in this behalf shall be final in all respects. Providedfurther that where the price or part thereof has been paid, the consignee isentitled without prejudice to his other rights to retain the rejected storestill the price paid for such stores is refunded by the Contractor save that suchretention shall not in any circumstances be deemed to be acceptance of thestores or waiver of rejection thereon. 2202. All rejectedstores shall in any event and circumstances remain and always be at the risk ofthe Contractor immediately on such rejection. If such stores are notremoved by the Contractor within the periods aforementioned, the InspectionOfficer may remove the rejected stores and either return the same to thecontractor at his risk and cost by such mode of transport as the Purchaser orInspecting Officer may decide, or dispose of such stores at the Contractor'srisk and on his account and retain such portion of the proceeds, if any fromsuch disposal as may necessary to recover any expense incurred in connectionwith such disposals (or any price refundable as a consequence of suchrejection). The Purchaser shall, in addition, be entitled to recover fromthe Contractor ground rent/demurrage charges on the rejected stores after theexpiry of the time limit mentioned above. 2203. The storesthat have been despatched by rail and rejected after arrival at destination maybe taken back by the Contractor either at the station where they were rejectedor at the station from which they were sent, after refunding the price paid forsuch stores and other charges refundable as a consequence of such rejection. If the contract placed for delivery f o. r. station of despatch, the Contractorshall pay the carriage charges on the rejected consignment at public tariffrates from the station of despatch to the station where they are rejected. If the Contractor elects to take back the goods at the station from which theywere despatched, the goods shall in addition, be booked back to him freight topay at public tariff rates and at owner's risk. The Contractor shall beliable to reimburse packing and incidental costs and charges incurred in suchreturn or rejected stores in addition to other charges refundable as aconsequence of rejection. The goods shall remain the property of theContractor unless and until accepted by the Purchaser after inspection. System of Payment.2301. Unlessotherwise agreed upon between the parties, payment for delivery of the storeswill be made on submission of bills in the prescribed form which may be obtainedfrom the Purchase Officer in accordance with the instructions given in theAcceptance of Tender, by a cheque or demand draft on a branch of the ReserveBank of India or State Bank of India transacting government business as may bedecided by the Purchaser. 2302. Payment forthe stores or for each consignment thereof will be made to the Contractor onsubmission of bills accompanied by required document in accordance with thefollowing procedure in contracts where such a facility to the Contractor hasspecifically been agreed to by the Purchaser: - (a) 95 per cent payments for the stores oreach consignment thereof will be made to the firms against proof of inspectionand despatch. The original railway receipt should be sent to the AccountsOfficer responsible for payment along with 95 per cent bill advising theparticulars of despatch to the consignee. The Accounts Officer afterpassing the 95 per cent bill should pass on the original railway receipt to theconsignee for taking delivery of the consignment. It should, however, beensured that there is no delay in the Accounts Office transmitting the originalrailway receipt to the consignee. (b) The balance 5 percent shall be paid onreceipt of the stores or each consignment thereof in accordance with the termsof the contract in good condition by the consignee, with a certificate to thateffect endorsed on the copy of the Inspection Note by the Consignee which shallaccompany the bill submitted by the Contractor. (c) In the case of F.O.B. & C. & F.contract 95 per cent of the price will be paid on presentation of shippingdocuments and inspection certificate and the remaining 5 per cent on receipt ofthe stores in accordance with the terms of the contract in good condition by theConsignee, and on producing the certificate of such receipt endorsed on one copyof the Inspection Note by the Consignee, or alternatively at the Contractor'soption, the full value of the stores will be paid after inspection, on receiptof the consignment in accordance with the terms of the contract in goodcondition by the Consignee and on producing a certificate of such receiptendorsed on one copy of the Inspection Note. 2303. In all othercontracts or in contracts where the Inspecting Officer also acts as the interimconsignee or where inspection is carried on by the Consignee himself atdestination and in all cases of local delivery full payment shall be made onsubmission of " Final 100 percent bill " supported by the Inspection Certificates and consignee's receipt as aforesaid tothe Accounts Officer concerned.
Note-
(2) In the case of Running Contracts, thesystem of payment will be similar to the above except that payment would be 98per cent and 2 per cent instead of 95 per cent and 5 per cent specified above. Withholding and lien in respect ofsums claimed.2401. Whenever anyclaim or claims for payment of a sum of money arises out of or under thecontract against the Contractor, the Purchaser shall be entitled to withhold andalso have a lien to retain such sum or sums in whole or in part from thesecurity, if any, deposited by the Contractor and for the purpose aforesaid, thePurchaser shall be entitled to withhold the said cash security deposit or thesecurity, if any, furnished as the case may be and also have a lien over thesame pending finalisation or adjudication of any such claim. In the eventof the security being insufficient to cover the claimed amount or amounts or ifno security has been taken from the Contractor, the Purchaser shall be entitledto withhold and have lien to retain to the extent of the such claimed amount oramounts referred to supra, from any sum or sums found payable or which at anytime thereafter may become payable to the Contractor under the same contract orany other contract with the Purchaser or the Government pending finalisation oradjudication of any such claim. It is an agreed term of the contract that the sum of money or moneys so withheldor retained under the lien referred to above, by the Purchaser will be keptwithheld or retained as such by the Purchaser till the claim arising out of orunder the contract is determined by the Arbitrator (if the contract is governedby the arbitration clause) or by the competent court as prescribed under clause2703 hereinafter provided, as the case may be, and that the Contractor will haveno claim for interest or damages whatsoever on any account in respect of suchwithholding or retention under the lien referred to supra and duly notified as'such to the Contractor. 2402. For thepurpose of Clause 2401, where the Contract or is a partnership firm or a limitedcompany, the Purchaser shall be entitled to withhold and also have a lien toretain towards such claimed amount or amounts in whole or in part from any sumfound payable to any partner / limited company, as the case may be, whether inhis individual capacity or otherwise. 2403. Lienin respect of Claims in other Contracts - Any sum of money due andpayable to the Contractor (including the security deposit returnable to him)under the contract may withhold or retain by way of lien by the Purchaser orGovernment against any claim of the Purchaser or Government in respect ofpayment of a sum of money arising out of or under any other contract made by theContractor with the Purchaser or Government. It is an agreed term of the contract that the sum of money so withheld orretained under this clause by the Purchaser or Government will be kept withheldor retained as such by the Purchaser or Government till his claim arising out ofthe same contract or any other contract is either mutually settled or determinedby the arbitrator, if the contract is governed by the arbitration clause or bythe competent court under Clause 2703 hereinafter provided, as the case may be,and that the Contractor shall have no claim for interest or damages whatsoeveron this account or on any other ground in respect of any sum of money withheldor retained under this clause and duly notified as such to the Contractor. CorruptPractices.2501. The Contractorshall not offer or give or agree to give to any person in the employment of thePurchaser or working under the orders of the Purchaser any gift or considerationof any kind as an inducement or reward for doing or forbearing to do or forhaving done or forborne to do any act in relation to the obtaining or executionof the contract or any other contract with the Purchaser or Government or forshowing any favour or for bearing to show disfavour to any person in relation tothe contract or any other contract with the Purchaser or Government. Anybreach of the aforesaid condition by the Contractor, or any one employed by himor acting on his behalf (whether with or without the knowledge of theContractor) or the commission of any offence by the Contractor or by any oneemployed by him or acting on his behalf under IX of the Indian Penal Code, 1860or the Prevention of Corruption Act, 1947 or any other act enacted for theprevention of corruption by public servants shall entitle the Purchaser tocancel the contract and all or any other contracts with the Contractor and torecover from the Contractor the amount of any loss arising from suchcancellation in accordance with the provisions of Clauses 0600 and 0700. 2502. Any dispute ordifference in respect of either the interpretation effect or application or theabove condition or of the amount recoverable thereunder by the Purchaser fromthe Contractor, shall be decided by the Purchaser, whose decision there on shallbe final and binding on the Contractor. Insolvencyand Breach of Contract.
2601.
The Purchaser may at any time, by notice in writing summarily determine the contract without compensationto the Contractor in any of the following events, that is to say
(a)
if the Contractor being an individual orif a firm, any partner thereof, shall at any time, be adjudged insolvent orshall have a receiving order or order for administration of his estate madeagainst him or shall take any proceeding for composition under any InsolvencyAct for the time being in force or make any conveyance or assignment of hiseffects or enter into any assignment or composition with his creditors orsuspend payment or if the firm be dissolved under the Partnership Act, or
(b)
if the Contractor being a company iswound up voluntarily or by the order of a Court or a Receiver, Liquidator orManager on behalf of the Debenture holders is appointed or circumstances shallhave arisen which entitle the Court or Debenture holders to appoint a Receiver,Liquidator or Manager, or
(c)
if the Contractor commits any breach ofthe contract not herein specifically provided for.
2701.
This contractshall be governed by the Laws of India for the time being in force.
2702.
Irrespectiveof the place of delivery, the place of performance or place of payment under thecontract, the contract shall he deemed to have been made at the place from whichthe acceptance of tender has been issued.
(1)
The Contractor shall comply with theprovisions of the Contract Labour (Regulation and Abolition) Act, 1970 and theContractor Labour (Regulation and Abolition) Central Rules, 1971, as modifiedfrom time-to-time, wherever applicable and shall also indemnify the Purchaserfrom and against any claims under the aforesaid Act and the Rules.
(2)
The Contractor shall obtain a validlicence under the aforesaid Act as modified from time-to-time before thecommencement of the contract and continue to have a valid licence until thecompletion of the contract. Any failure to fulfil this requirement shallattract the penal provisions of the contract arising out of the resultant nonexecution of the contract.
(3)
The Contractor shall pay to labouremployed by him directly or through Sub-Contractors the wages as per provisionsof the aforesaid Act and the Rules wherever applicable. The Contractor,shall, notwithstanding the provisions of the contract to the contrary, cause tobe paid the wages to labour indirectly engaged on the contract including anyengaged by his Sub-Contractors in connection with the said contract, as if thelabour had been immediately employed by him.
(4)
In respect of all labour directly orindirectly employed in the contract for performance of the Contractor's part ofthe contract, the Contractor shall comply with or cause to be complied with theprovisions of the aforesaid Act and the Rules wherever applicable.
(5)
In every case in which, by virtue of theprovisions of the aforesaid Act or the Rules, the, Purchaser is obliged to payany amount of wages to a workman employed by the Contractor or hisSub-Contractor in execution of the contract or to incur any expenditure inproviding welfare and health amenities required to be provided under theaforesaid Act and the Rules or to incur any expenditure on account of thecontingent liability of the Purchaser due to the Contractor's failure to fulfilhis statutory obligations under the aforesaid Act or the Rules the Purchaserwill recover from the Contractor, the amount of wages so paid or the amount ofexpenditure so incurred, and without prejudice to the rights of the Purchaserunder Section 20, Sub-section (2) and Section 21, Sub-section (4) of theaforesaid Act, the Purchaser shall be at liberty to recover such amount or partthereof by deducting it from the security deposit and/or from any sum due by thePurchaser to the Contractor whether under the contract or otherwise. ThePurchaser shall not be bound to contest any claim made against it underSub-section (i) of Section 20 and Sub-section (4) of Section 21 of the aforesaidAct except on the written request of the Contractor and upon his giving to thePurchaser fun security for all costs for which the Purchaser might become liablein contesting such claim. The decision of the Purchaser regarding theamount actually recoverable from the Contractor as stated above, shall be finaland binding on the Contractor.
The headings of conditions here to shall not affect the constructionthereof.
(b)
In the event of the arbitrator dying,neglecting or refusing to act or resigning or being unable to act for anyreason, or his award being set aside by the court for any reason, it shall belawful for the authority appointing the arbitrator to appoint another arbitratorin place of the outgoing arbitrator in the manner aforesaid.
(c)
It is further a term of this contractthat no person other than the person appointed by the authority as aforesaidshould act as arbitrator and that if for any reason that is not possible, thematter is not to be referred to 'arbitration at all.
(d)
The arbitrator may from time-to-time withthe consent of all the parties to the contract enlarge the time for making theaward.
(e)
Upon every and any such reference, theassessment of the cost incidental to the reference and award respectively shallbe in the discretion of the arbitrator.
(f)
Subject as aforesaid, the ArbitrationAct, 1940 and the rules thereunder and any statutory modifications thereof forthe time being in force shall be deemed to apply to the arbitration proceedingsunder this clause.
(g)
The venue of arbitration shall be theplace from which the acceptance note is issued or such other place as thearbitrator at his discretion may determine.
(h)
In this clause the authority, to appointthe arbitrator includes, if there be no such authority, the officer who is forthe time being discharging the functions of that authority, whether in additionto other functions or otherwise.
All contract if and when placed will be subject to following fall clause
3001.
The price chargedfor the stores supplied under the Contract by the contractor shall in no eventexceed the lowest price at which the contractor sells the stores or offer tosell stores of identical description. To any personnel organisationsincluding the purchaser or any Department of the Central Government or anyRailway Office or any Railway Undertaking, as the case, may be during the periodtill performance of all Supply Orders placed during the currency of the contractis completed. The lower price will be applicable to supplies made afterthe date of coming into force of such reduction or sale or offer to sell at areduced rate.
3002.
If at anytime, during the said period the contract or reduces the sale price, sells oroffer to sell such stores to any persons organisation including the purchaser orany Department of Central Government or any Railway Office or any RailwayUndertaking as the case may be at a price lower than the price chargeable underthe contract, he shall forthwith notify such reduction or sale or offer of saleto the Purchaser and the price payable under the contract for the storessupplied after the date of coming into force or such reduction or sale or offerof sale shall stand correspondingly reduced.
The above stipulation will, however, not apply to
(a)
Exports by the Contractor
(b)
Sale of goods as original equipment atprices lower than the prices charged for normal replacement.
(c)
Sale of goods such as drugswhich have expiry dates.
3003.
The Contractorshall fumish the following certificate to the concerned Accounts Officer alongwith each bill for payment of supplies made against the Rate Contract.
* I/We certify that there has been no reduction in sale price of thestores of description identical to the stores supplied to the Government underthe contract herein and such stores have not been offered sold by me/us to anyperson/organisation including the purchaser or any Department of CentralGovernment or any Railway Office or any Railway Undertaking as the case may beupto the date of bill/ the date of completion of supplies against all supplyorders placed during the currency of the contract at a price lower than theprice charged to the Government under the contract except for quantity of storescategories under sub clauses (a), (b) and (c) of sub-para (ii) above, details ofwhich are as follows
Note.
-The contractor will also inform theFA& CA0 concerned and the COS as soon as supplies against all supply orderplaced against the contract are completed.
3100.
Where under acontract the price payable is fixed on F.O.R. station of despatch basis, theContractor shall, if the consignee rejects the stores at destination be liablein addition to his other liabilities, to reimburse to the Purchaser the freightpaid by the Purchaser.
3101.
Notificationof Result of lnspection
.-Unless otherwise provided in the specificationof schedule, the examination of the stores will be made as soon as practicableafter the same have been submitted for inspection and the result of theexamination will be notified to the Contractor.
3102.
InspectionNotes
.--On the stores being found acceptable by the inspecting Officer heshall furnish the Contractor with necessary copies of Inspection Notes dulycompleted, for being attached to the Contractor's bill in support thereof.
3201.
TheContractor/Seller hereby covenants that it is a condition of the contract thatall goods/stores/articles furnished to the Purchaser under this contract shallbe of the highest grade. free of all defects and faults and of the bestmaterials, quality, manufacture and workmanship throughout and consistent withthe established and generally accepted standards for materials of the typeordered and in full conformity with the contract specification, drawing orsample, if any and shall, if operable, operate properly.
3202.
The Contractoralso guarantees that the said goods/stores/articles would continue to conform tothe description and quality as aforesaid, for a period of 30 months after theirdelivery or 24 months from the date of placement in service whichever shall besooner, and this warranty shall survive notwithstanding the fact that thegoods/stores/articles may have been inspected, accepted and payment thereformade by the Purchaser.
3203.
If during theaforesaid period, the said goods/stores/articles be discovered not to conform tothe description and quality aforesaid or have deteriorated, otherwise that byfair wear and tear the decision of the Purchaser in that behalf being final andconclusive that the Purchaser will be entitled to reject the saidgoods/stores/articles or such portions thereof as may be discovered not toconform to the said description and quality. On such rejection, thegoods/stores/articles will be at the Seller's risk.
If the Contractor/Seller so desires, the rejected goods may be taken overby him or his agents for disposal such manner as he may deem fit within a periodof 3 months from the date of such rejection. At the expiry of the period,no claim whatsoever shall lie against the Purchaser in respect of the saidgoods/stores/articles, which may be disposed of by the Purchaser in such manneras he thinks fit. Without prejudice to the generality of the foregoing,all the provisions in the Indian Railways Standard Conditions of Contractrelating to the �rejection of stores' and �failure' and 'termination' addand Clause 3100-02 above shall apply.
3204.
TheContractor/Seller shall, if required, replace the goods or such portion there ofas have been rejected by the Purchaser, free of cost, at the ultimatedestination, or at the option of the Purchaser, the Contractor/Seller shall payto the Purchaser, the value thereof at the contract price and such otherexpenditure and damage as may arise by reason of the breach of the conditionsherein before specified. Nothing herein contained shall prejudice anyother right of the Purchaser in that behalf under this contract or -otherwise.
(i)
The Contractor shall whenever called uponand requiring to produce or cause to be produced for examination by anyGovernment Officer duly authorised in that behalf, any cost or other accountbook of account, voucher, receipt, letter, memorandum, paper or writing or anycopy of or extract from any such document and also furnish information any wayrelating to such transaction and procedure before the duly authorised GovernmentOfficer returns verified in such manner as may be required relating in any wayto the execution of this contract or relevant for verifying or ascertaining thecost of execution of this contract (the decision of such Government Officer onthe question of relevancy of any document, information of return being final andbinding on the parties).
The obligation imposed by this clause is without prejudice to theobligation of the contractor under any statute, rules or orders shall be bindingon the Contractor.
(ii)
The Contractor shall, if the authorisedGovernment Officer so requires (whether before or after the prices have beenfinally fixed), afford facilities to the Government Officer concerned to visitthe Contractors works for the purpose of examining the processes of manufactureand estimating or ascertaining the cost of production of the articles. Ifany portion of the work be entrusted or carried out by a sub-contractor or anyof its subsidiary or allied firm or company, the authorised Government Officershall have power to examine all the relevant books of such sub-contractor or anysubsidiary or allied firm or company shall be open to his inspection asmentioned in clause (i).
(iii)
If on such examination, it isestablished that the contracted price is in excess of the actual cost plusreasonable margin of profit, the Purchaser shall have the right to reduce theprice and determine the amount to a reasonable level.
(iv)
Where a contract provides for bookexamination clause, the Contractor or its agency is bound to allow examinationof its books within a period of 60 days from the date the notice is received bythe Contractor, or its agencies calling for the production of documents as underclause (i) above. In the event of Contractor's or his agency's failure todo so, the contract price would be reduced and determined according to the bestjudgement of the Purchaser which would be final and binding on the Contractorand his agencies.
(a)
The Purchaser has the right to recoverfrom the contractor under the provision of clause 0702 (a) of I.R.S. Conditionsof Contract liquidated damages on the stores which the Contractor has failed todeliver within the period fixed for delivery.
(b)
That no increase in price on account ofany statutory increase in or fresh imposition of Customs Duty, Excise Duty,Sales Tax on account of Foreign Exchange variation or on account of any othertax or duty liveable in respect of stores specified in the contract which takesplace after the date of the delivery period stipulated in the contract shall beadmissible on such of the said stores as are delivered after the date of thedelivery stipulated in the contract.
(C)
That not with standing any stipulation inthe contract for increase in price on any other ground no such increase whichtakes place after the date of the delivery stipulated in the contract shall beadmissible on such of the said stores as are delivered after the expiry of thedelivery period stipulated in the contract.
(d)
But nevertheless, the Purchaser shall beentitled to the benefit fit of any decrease in price on account of reduction inor remission of Custom Duty, Sales Tax or on account of Foreign Exchangevariation or on account of any other Tax or Duty or on other ground asstipulated in the price variation, clause which takes place after the expiry ofthe date of delivery period stipulated in the contract.
3401.
The Contractor shall not despatch the Stores till such time as an extension interms of para 3400 (a) to (d) above is granted by the Purchaser and accepted bythe Contractor. If the stores are despatched by the Contractor before anextension letter as aforesaid is issued by the Purchaser and the same areaccepted by the Consignee, the acceptance of the stores shall be deemed to besubject to the conditions (a) to (d) mentioned in the paragraph 3400 above.
3402.
In case wherethe entire quantity has not been tendered for inspection with in the deliveryperiod stipulated in the contract and the Purchaser chooses to grant anextension of the delivery period the same would be subject to conditions (a) to(d) mentioned in the paragraph 3400 above.
3500.
These(special) conditions wherever they differ from the Invitation to Tender andInstruction to Tenderers over ride the latter.
|
|
|
|||
|